
In previous years, a project for the construction of a railway line from st. Sovgavan - City up to m. Anastasia r.p. Salmon, where the port of a fishing collective farm is located, with a total length of 7 km.
Within the framework of this project, a clearing was cut and a partial filling of the railway embankment was carried out at a distance of 4 km.
The railway track was laid at a distance of 1 km.

A promising direction will be the construction of a refrigerator for 10,000 tons.
After China's refusal to accept pollock, the demand for storage increased manifold.
At the end of 2020, RusHydro put into operation the Sovetskaya Gavan CHPP, which will provide refrigeration units with the required capacity.

To expand opportunities for more efficient activities, the collective farm has the necessary documentation and projects to expand the port area and lengthen Berth No. 35 to the available 250m. add 100 m to bring the berth up to 350 m. All the necessary special building structures are available to carry out these works. The coastline allows extending the quay wall to larger dimensions.